Skip to product information
REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin, Silver Infused Fabric for Hygienic Sleep, Silky Smooth for Curly Hair, High Elastic for Snug Fit (19x35 inches)
$102.79
Sale price
$102.79
Regular price
Shipping calculated at checkout.
Description
About This
- Instant Cooling: Experience sleeping on the cold side of the pillow with Rest’s advanced cooling pillowcases; Wake up refreshed and rejuvenated with cutting-edge performance fabric that offers instant and long-lasting cooling sensation; Evercool pillowcases are ideal for all seasons and hot sleepers with night sweats, hot flashes
- Luxuriously Soft and Smooth: Science-backed fabric innovation that’s softer, smoother and stronger than silk; Glides effortlessly against your skin for frictionless sleep and prevent crush wrinkles caused by side sleeping; Elevate your sleep with unbelievable comfort
- Always a Good Hair Day: Reduce friction, prevent frizz and hair damage with Evercool’s ultra-fine, super smooth fabric; Curly and wavy hair approved with our anti-static cooling pillowcases that don’t pull or tug; Don’t wake up tired or with messy hair ever again
- Self-Cleaning Fabric Tech: Lasting hygienic pillowcases for sensitive skins. With Noble's Ionic+ extruded silver yarn technology, positively charged silver ions are permanently embedded into Evercool+ fiber; The pillow case is self-cleaning to effectively inhibit and eliminate odor
- Stain Resistant: Resistant to oil absorption; The pillowcases will always look and feel brand new, without stains or color fading; Plus, you can rest assure any skin care products will stay where they belong, and you can look and feel your best
Overview
- Size : King (2 pcs)
- Material : Evercool+ Performance Fabric
- Brand : REST
- Color : Lavender Breeze
- Product Care Instructions : Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/n… See more
Care
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
Design
Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.